Proven Results

Case Studies

In-depth project write-ups covering the challenge, our approach, and the results. Each case study includes before/after comparisons and client feedback.

6 completed case studies5 service categories£15,550+ in documented project value100% client satisfaction
War Memorial Stone Cleaning
Stone Restoration
£1,400
Heritage Conservation

War Memorial Stone Cleaning

Precision laser cleaning of a granite war memorial — lichen, pollution, and biological growth removed to restore full legibility of inscribed names.

✓ Listed monument — zero surface damage
Duration: 2 daysRead Case Study
Steel Bridge Structural Restoration
Rust Removal
£3,200
Infrastructure

Steel Bridge Structural Restoration

Full laser descaling of 280m² of Victorian-era bridge steelwork while the bridge remained open to the public — no sandblasting, no closures.

✓ Bridge stayed open throughout
Duration: 11 daysRead Case Study
Industrial Pump Station Overhaul
Rust Removal
£2,800
Manufacturing

Industrial Pump Station Overhaul

14 industrial pump housings cleaned in-situ at a food processing plant during a 5-day shutdown — no chemicals, no dismantling, food-safe process.

✓ In-situ — no dismantling required
Duration: 4 daysRead Case Study
Commercial Fishing Vessel Hull
Paint Stripping
£2,400
Marine

Commercial Fishing Vessel Hull

Complete anti-fouling paint and barnacle removal from a 22m fishing vessel hull during dry dock — bare metal achieved in 3.5 days, ready for immediate recoating.

✓ Hull ready for primer next morning
Duration: 3.5 daysRead Case Study
Railway Underpass Graffiti Clearance
Graffiti Removal
£950
Local Authority

Railway Underpass Graffiti Clearance

120m² of graffiti-covered concrete railway underpass cleared without chemicals — previous chemical tide marks also removed, anti-graffiti coating applied.

✓ Zero chemicals — watercourse safe
Duration: 2 daysRead Case Study
Victorian Church Fire Damage
Fire Damage
£4,800
Heritage Restoration

Victorian Church Fire Damage

340m² of listed sandstone cleaned of fire soot and carbon deposits following a serious electrical fire — approved by Historic Environment Scotland.

✓ Approved by Historic Environment Scotland
Duration: 18 daysRead Case Study

Have a similar project?

Every job is different. Send us photos and a description and we'll provide a detailed quote within 24 hours.